Key point. Where the contract requires joint inspection, a specific defect was timely notified and goods preserved, propose workable inspection arrangements. An invitation neither replaces the selected remedy nor itself creates a new warranty period.
Business supply; current warranty period; specific defect timely notified; contractual joint inspection required; goods/evidence preserved.
Excludes no contractual inspection duty, lost goods and attempts to restart expired warranty. Expert procedure and consequences of non-attendance need separate assessment.
Россия · RU-B058 · Current as of 18.10.2026. Lawyer Alexander Lebedev, 19 years of practice.