Key point. Describe the specific construction defect in the accepted apartment, show discovery within the warranty and request repair free of charge in writing. Propose a reasonable period and agree it with the developer, keeping evidence.
The apartment was handed over under a DDU concluded in 2026. A construction defect was discovered within the contractual warranty. The demand is repair by the developer, without finishing-related money claims or rescission.
Finishing, technical/engineering equipment, alterations, normal wear and initial acceptance require different analysis. Actual documents and defect causes are unreviewed; repair or litigation success is not guaranteed. Penalties, repair costs and rescission are not calculated here.
Россия · RU-C039 · Current as of 20.10.2026. Lawyer Alexander Lebedev, 19 years of practice.