Key point. When the result is actually ready for transfer, invite the customer to contractual acceptance. Identify the result, inspection location, date and method; notification does not replace actual delivery, acceptance or the customer signature.
When this guide helps
Actually completed ordinary business work, available for inspection/transfer with documents; commencement of contractual acceptance procedure.
When you need different advice
Excludes consumer, construction, design, procurement and special regimes; false readiness, automatic silence-based acceptance, result sale and monetary demands.
What the full memo contains
- step-by-step actions (4)
- documents to prepare
- questions for a lawyer
- sources: ГК РФ: часть первая от 30.11.1994 № 51-ФЗ; часть вторая от 26.01.1996 № 14-ФЗ